Ditto here.
Called today and was told car was built yesterday and I should call back Monday or Tuesday with a rail number.
This was a very nice surprise since I was told 5 days ago the scheduled build date had been moved from Aug 6 to Aug 17. So the original forecast was correct.
But then I was at the dealer later in the day getting an estimate for a possible trade-in and I showed up in G status. I think cars move so quickly through these stages, probably within 24 to 36 hours, that the online tracking system is always a few steps behind. Hope to be in KZM on Monday.
D1 Gateline schedule - scheduled to be built
E Frame
F Paint
G Trim
I Built not ok'd
J Built ok'd
JB Shipped to body vendor
JE Emission check
JS Shipped to storage
KZ Released by plant , invoiced
KZL Released - not shipped
KZM First rail departure
|
|
|
|