I ordered on 6/19 and just went to "D" status today. Got my VIN as well. Estimated build date is being reported as 7/29. I ordered the sunroof, nav, sirius, uconnect, et al so they must not be expecting any shortages with those.

Interestingly, I called on Tuesday to check status and was told it was BX and that all July scheduling had already been completed and I shouldn't expect any movement (to another status) until the first week of August. However, after talking with the dealer, he was expecting it sooner. So I called back. And guess what....the Tuesday person was wrong.

I guess you just have to keep calling every few days to see if something really does change.
 

· Registered
Joined
·
4,605 Posts
Ordered May 27 and was also moved to D yesterday.
Apparently the first Wed of each month is when the cars are allocated.

Sent a follow-up email to my dealer asking for the "scheduled build date" and he said he didn't have one yet. I think he implied that he won't know until the parts are pulled (D1?), or something to that nature.
Curious how your dealer was able to give you an estimated build date.
Was that his guess or was that provided by Chrysler?
 

· Premium Member
Joined
·
1,549 Posts
I got the build date from the Chrysler 800 number. She did say though that the date is subject to change and not completely firm until it is D1 status. Even if it changes, from this point it should be close.:)
 

· Registered
Joined
·
43 Posts
JonW said:
I ordered on 6/19 and just went to "D" status today. Got my VIN as well. Estimated build date is being reported as 7/29. I ordered the sunroof, nav, sirius, uconnect, et al so they must not be expecting any shortages with those.

Interestingly, I called on Tuesday to check status and was told it was BX and that all July scheduling had already been completed and I shouldn't expect any movement (to another status) until the first week of August. However, after talking with the dealer, he was expecting it sooner. So I called back. And guess what....the Tuesday person was wrong.

I guess you just have to keep calling every few days to see if something really does change.

You ordered 6/19 with a sunroof and you already have a VIN and build date??? Who is your dealer because they must have some pull. I ordered 6/15 and it is still in BX status. Using the friends and family plan so I had to first find a dealer willing to take it. When I heard the allocation examples it became clear I may be in for a long wait. Hope not. The wait is killing me and its only been a few weeks. :D
 

· Registered
Joined
·
136 Posts
Here are all the codes and what they mean.

Order Status Codes Unscheduled
BX – good order available for scheduling
BB – fleet order only – review by Bid Department
BD – special equipment processing
BE – edit error – coding error which must be corrected before the
order can be considered for scheduling
BG – order has passed edit but cannot be considered for scheduling
BG F – finance hold – automatic cancellation after 15 days
BG B – model or option hold
BG B – build out hold
BG L – material restriction hold
BG M – material hold (fleet)
ZA – cancelled order
Scheduled
C – tentative schedule
D – firm schedule: serial number is assigned
D1 – gateline: plant has sequenced the unit for production, estimated
ship date assigned
Build
E – framing
F – paint
G – trim
Built
I – unit is pending final inspection
J – vehicle has passed final inspection, but has not been released to
carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Traffic Codes
KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone or dealer hold, sales hold, vehicle prep hold, tax hold,
finance hold, dealer refusal, diversion hold, vehicle diverted,
derailment hold
KZ OC – carrier delay hold, rail car shortage, bad load, insufficient
load, inclement weather, need shipping order, manifest error, strikebound
hold, emission or safety hold.
KZ OD – mechanical failure, glass damage, vehicle lacking parts,
vehicle in repair, storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle,
test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle
scrapped, donate vehicle, repair and auction
KZ OH – all other carrier codes that currently post an “O” delay code
that are not included above
KZ R – vehicle with a few days of arrival to dealer
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction
Plant List Jefferson North (C) Grand Cherokee
Newark (F) Durango
Sterling Heights (N) Sebring/Stratus Sedans &
Sebring Convertible
Brampton (H) Concorde, Intrepid, 300M
Windsor (R) Lowline & Highline Minivans (Pacifica)
Connor (V) Viper
Dodge City (S) Dakota
Toledo II (P) Wrangler
Toledo North (W) Liberty
Belvidere (D) Neon
Diamond Star (E) Sebring & Stratus Coupe
St. Louis South (B) Highline & Premium Minivans
St. Louis North (J) Ram Pickups – Regular & Quad Cabs
Lago Alberto (M) Ram Pickups – Regular & Quad Cabs
Saltillo (G) Ram Pickups – Quad Cabs
Toluca (T) PT Cruiser
Crossfire In-Transit Status Codes JB-KA Released by Plant to Carrier
JB-KC Carrier Delivered to Port
JB-KD Received at Port of Exit
JB-KK Cleared at Port of Entry
JB-KN Arrived at Port of Entry
JB-KP Arrived at Bonded Warehouse (if required)
JB-KR Arrived at Pool Storage (Zone Inventory)
JB-KT Arrived at Vehicle Processing Center (if required)
KZ Released from Vehicle Processing Center/Port for delivery to
dealer
 

· Premium Member
Joined
·
51 Posts
jimmymac

:) Ordered cool white with gray interior w/everything except moon roof on 6/1.
Called DC 800 number this morning and was told that my 300C is in Michigan waiting to be loaded on train and to expect delivery in approx. 2-weeks (7/31).

7/19 - This morning I was told that my 300C left Michingan by rail on 7/16. The young woman at DC even supplied me with the railcar number.
 

· Registered
Joined
·
922 Posts
Ok I have all my goodies (grill,b-pillars,floor mats,splash guards,rims,tires, & license plate frame) in my garage for my 300C. But got a call from my Sales Manager 7/23 :mad: that my 300C will not be in now until early August. I'm just so ready to have my 300C. But the good thing is July is over in 5 days :)
 

· Registered
Joined
·
592 Posts
ordered 5/2 loaded no sat or cold weather
VIN issued 7/6
7/6 told build date tentative for 7/26
7/20 told build date tentative for 8/7
7/26 told build date tentative for 8/17

this starts my 13th week of waiting ^%@^%[email protected]%^#@^%#@%^[email protected]

I am so frustrated it is turning me off and making me question the whole purchase.. I'm sure the dealer would love to have me bail so he can jack someone else for the markup

this sucks!
 

· Premium Member
Joined
·
51 Posts
Just took delivery of my cool white 300C and after a check-out took it home and then for a drive. Rides like a dream; now it's time to check the manuals and learn more about my baby. From order to delivery took 56 days. I traded in my 2002 300M and there is no comparison with the "C".
 